Friday, April 17, 2015

Follow-up After Tender Accepted... Continued 2

As expected, we received the first DA drawings in the post.  We had a review and pointed out to Jessica that the balcony size needs to be revised.  Elderton sent a revised drawing with an updated balcony the next day.

We also requested the relocation of the rainwater tank and aircon from the righthand side to the lefthand side (back of the garage).  This would free up a large chunk of space from the righthand side pathway.   Hopefully, the clearances would be enough to fit the tank and aircon.