Saturday, September 19, 2015

Slab Completed

As promised by Elderton, concrete slab was poured and completed at the end of the week. That made us 3 weeks ahead of the schedule from the construction diagram.  

As we wait for a 1 week concrete curing time, we'll expect an email for a slab claim. As instructed by our broker, once we receive the first invoice, we have to sign and pass it to him.  They will arrange the payment to the builder.


Garage


Porch / Study Room


Alfresco


Theatre / Rainwater tank



They say that coins bring luck and good fortune.  We prepared something from places we call home - Australia, Singapore, and Philippines.  Unfortunately, we were not at the site when the slab was poured. So I just chucked them in the soil instead. LOL