Remaining cladding were installed at the side and back of the house. Colorbond roofing for the garage was also completed.
Frames for the sliding doors were installed. Rangehood ducting were positioned to be vented outside.
Electrical outlets for the downlights (x15). These were located in the family, kitchen and foyer. All other rooms shall have battens for downlight installation after handover.
Since I'm not having NBN hub, Costa Electricals offered to provide a conduit from the garage going to the WIR. This means that the NBN box will be installed in the WIR alongside wih my router and NAS.
WIR wirings and wall plates. Data and phone shall be running out from the WIR to other data points in the house.
Data point and TV Antenna point