Before the week ended, ground floor roof tiles were completed at the back part of the house (alfresco and media room).
Alfresco roof sarking
Aircon ducting
Colorbond roofing (at the garage) was left to be done. This was scheduled for the following week, alongside with the electrical fit-out.