Tuesday, March 22, 2016

Kitchen Cabinets et al.

Kitchen cabinets were installed before the Easter weekend. The overhead cabinets looks sweet!! 


 Bathtub and laundry tub delivered

Timber skirting for ground floor ready to be installed.


 Bathroom/Laundry tiles delivered.

Cutouts were done for the electrical outlets and powerpoints. Mounting clips were also installed.